Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Main menu
Environmental Topics
Laws & Regulations
About EPA
Health & Environmental Research Online (HERO)
Contact Us
Print
Feedback
Export to File
Search:
This record has one attached file:
Add More Files
Attach File(s):
Display Name for File*:
Save
Citation
Tags
HERO ID
2644935
Reference Type
Journal Article
Title
Preventive maintenance scheduling of the pulping unit in a paper plant
Author(s)
Garg, H; Rani, M; Sharma, SP
Year
2013
Is Peer Reviewed?
Yes
Journal
Japan Journal of Industrial and Applied Mathematics
ISSN:
0916-7005
Volume
30
Issue
2
Page Numbers
397-414
DOI
10.1007/s13160-012-0099-4
Web of Science Id
WOS:000321593000007
Abstract
This paper presents periodic preventive maintenance (PM) of a system with deteriorated components. PM is one of the strategies that can be applied to reduce the machine breakdown problems due to unplanned maintenance. However, finding the best interval for providing the necessary PM actions is an important issue. In that direction, this paper studies PM in simultaneously considering three actions, mechanical service, repair and replacement for a multi-components system based on maintenance cost. The cost function of a maintenance policy is used to determine the component replacement interval. However, the PM interval of the system is chosen as the minimum among them. The degraded behavior of the component is modeled by a reliability equation, and the effect of PM actions to reliability is formulated based on maximizing the maintenance-benefit analysis. The application of the proposed framework has been demonstrated through the pulping unit of a paper mill situated in a northern part of India which produces approximately 200 tons of paper per day.
Keywords
Preventive maintenance; Paper mill; Reliability; Maintenance cost
Home
Learn about HERO
Using HERO
Search HERO
Projects in HERO
Risk Assessment
Transparency & Integrity