Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Main menu
Environmental Topics
Laws & Regulations
About EPA
Health & Environmental Research Online (HERO)
Contact Us
Print
Feedback
Export to File
Search:
This record has one attached file:
Add More Files
Attach File(s):
Display Name for File*:
Save
Citation
Tags
HERO ID
3199411
Reference Type
Journal Article
Title
Factors associated with latency period in preterm prelabor rupture of membranes
Author(s)
Phupong, V; Kulmala, L
Year
2016
Is Peer Reviewed?
1
Journal
Journal of Maternal-Fetal & Neonatal Medicine
ISSN:
1476-7058
EISSN:
1476-4954
Volume
29
Issue
16
Page Numbers
2650-2653
Language
English
PMID
26482892
DOI
10.3109/14767058.2015.1095884
Abstract
OBJECTIVE:
To determine the factors associated with prolonged latency periods in preterm prelabor rupture of membrane (PPROM).
METHODS:
This retrospective study analyzed data from singleton pregnant women with gestational age between 28 and 34 weeks suffering from PROM. Multivariate regression analysis was used to evaluate the association between the factors and latency period ≥ 2 and ≥ 7 days.
RESULTS:
A total of 231 cases of PPROM were included. Prolong latency period ≥2 and 7 days were achieved in 141 (61%) and 54 (23.4%) cases. Higher gestational age at PPROM and cervical dilatation >2 cm were associated with a shorter latency period <2 days. Multiparity and presence of uterine contraction at admission were associated with a shorter latency period <7 days. Prophylactic antibiotics [odds ratio (ORs) 6.69, 95% confidence interval (CI) 3.0-14.89], and tocolysis (ORs 2.74, 95%CI 1.25-6.02) were factors associated with latency period ≥ 2 days. Only prophylactic antibiotics (ORs 7.7, 95%CI 2.54-23.34) was a factor associated with latency period ≥7 days.
CONCLUSIONS:
Prophylactic antibiotics and tocolysis are two major factors associated with latency period ≥2 days in PPROM, where prophylactic antibiotics is the main factor associated with latency period ≥7 days in PPROM.
Home
Learn about HERO
Using HERO
Search HERO
Projects in HERO
Risk Assessment
Transparency & Integrity