Optimal supply planning in MRP environments for assembly systems with random component procurement times 
Louly, MA; Dolgul, A; Hnaien, F; Rezg, N; Craye, E 
2008 
Yes 
International Journal of Production Research
ISSN: 0020-7543
EISSN: 1366-588X 
46 
19 
5441-5467 
This paper examines supply planning in an MRP environment for assembly systems under lead time uncertainties. Indeed, inventory control in a supply chain is crucial for companies who wish to satisfy their customer demands on time as well as controlling costs. A common approach is to use the MRP techniques. However, these techniques are based on the supposition that lead times are known. In an actual supply chain the lead times are often random variables. Therefore, we develop an efficient exact model to aid in MRP parameterization under lead time uncertainties, more precisely to calculate planned lead times when the component procurement times are random. The aim is to find the values of planned lead times which minimize the sum of the average component holding cost and the average backlogging cost. The developed approach is based on a mathematical model of this problem with discrete decision variables and a branch and bound algorithm. (English) 
Supply planning; Assembly systems; MRP environment; Random lead times; Planned lead times optimization; Discrete model; Branch and bound; Modélisation; Optimisation; Méthode séparation et évaluation; Prise de décision; Encours (de fabrication); Commande en retard; Coût moyen; Paramétrisation; Logistique; Gestion stock; Système incertain; Temps mise en route; Marché contrat; Montage; Production en flux poussé; Méthode MRP II; Gestion ressources; Planification optimale; Modeling; Optimization; Branch and bound method; Decision making; In-process inventory; Backorder; Average cost; Parameterization; Logistics; Inventory control; Uncertain system; Setup time; Procurement; Assembly; Make to stock; Manufacturing resource planning; Resource management; Optimal planning; Modelización; Optimización; Método branch and bound; Toma decision; Depósito en-curso; Encargo en retardo; Coste medio; Parametrización; Logística; Administración depósito; Sistema incierto; Tiempo iniciacion; Contrato; Montaje; Producción flujo empujado; Método MRP II; Gestión recursos; Planificación óptima