Health & Environmental Research Online (HERO)


Print Feedback Export to File
6904590 
Technical Report 
Project management plan for asbestos control at Randolph Air Force Base 
Broers, GJ 
1988 
EGG-HWP-8018 
English 
The United States Air Force Air Training Command (ATC) Headquarters requested assistance from the Idaho National Engineering Laboratory (INEL) in February, 1987 to develop processes and procedures and provide program management to minimize and control asbestos hazard at its thirteen bases. This effort was requested by the ATC to comply with Executive Order 12088 under which the USAF is directed to meet all applicable federal, state, and local environmental regulations. In response to that request the efforts identified within this document provide the ATC with a thorough base-wide Asbestos Survey Report, an Asbestos Management Plan and an Operations and Maintenance Plan for Randolph AFB which, when implemented, will comply with current and anticipated federal laws and provide the base with accurate information needed for long range asbestos management. The other twelve bases will be surveyed and sampled in the four years to follow with appropriate asbestos management plans developed for each. 
DE88007738