Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Main menu
Environmental Topics
Laws & Regulations
About EPA
Health & Environmental Research Online (HERO)
Contact Us
Print
Feedback
Export to File
Search:
This record has one attached file:
Add More Files
Attach File(s):
Display Name for File*:
Save
Citation
Tags
HERO ID
7040952
Reference Type
Journal Article
Title
HFE SAFETY EVALUATION IN ANGRA-1 NPP FOR THE PREPARATION AND INCLUSION OF A CHAPTER 18 IN THE PLANT FINAL SAFETY ANALYSIS REPORT
Author(s)
Trueba Alonso, P; Carlos Valdivia, J; Fernandez Illobre, L; Hulsmans, M; ,
Year
2014
Publisher
AMER SOC MECHANICAL ENGINEERS
Location
NEW YORK
Web of Science Id
WOS:000367108000015
Abstract
Angra-1 Nuclear Power Station (Westinghouse PWR-600 MW, 2 loops) started commercial operation in 1985, being property of Eletronuclear, subsidiary of Eletrobras in Brazil. Angra-1 has been preparing the necessary measures to renew the operating license and to apply for a lifetime extension up to 60 years.Among the many activities to perform, there are some related to fulfilling the requirements of the Brazilian regulator, the CNEN. These include requirements related to Human Factors Engineering (HFE) that included the preparation of a Chapter 18 of HFE, to become part of the plant's Final Safety Analysis Report (FSAR).In the framework of the Instrument for Nuclear Safety Cooperation (INSC), created and funded by the European Union (EU) to enhance nuclear safety world-wide, cooperation activities between the EU and the Government of Brazil were set up in 2009. One of the INSC projects funded was to support the Brazilian nuclear operator of Angra-1 in the field of HFE. In 2010, the implementation of the project was awarded to a consortium lead by Tecnatom for performing a HFE Safety Evaluation to the plant and to provide support for preparing this Chapter 18.For this Project a specific methodology was developed for the execution of the Safety Evaluation. The methodology has been developed for evaluating from the FIFE viewpoint a plant in operation, from the beginning of commercial operation until nowadays, including the design modifications performed to date. The obtained results have been used for developing the aforementioned Chapter 18.The main results of the Project Execution have been:1.The developed methodology has made it possible to perform a comprehensive HFE evaluation of Angra-1, including the analysis of Post-TMI requirements, the design included in the current FSAR, the existing Angra-1 procedures and the verification of the current Main Control Room.2. Technical support has been provided to Angra-1 for the preparation of Chapter 18 of the FSAR, following the structure of NUREG-0711, and using the results of the HFE Safety Evaluation.3. An Action Plan has been developed for identifying and addressing in the future all those deficiencies found during the HFE Safety Evaluation, as well as those activities that are the consequence of the new FSAR Chapter 18.
ISBN
978-0-7918-4589-9
Conference Name
22nd International Conference on Nuclear Engineering (ICONE22)
Conference Location
Prague, CZECH REPUBLIC
Home
Learn about HERO
Using HERO
Search HERO
Projects in HERO
Risk Assessment
Transparency & Integrity