Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Main menu
Environmental Topics
Laws & Regulations
About EPA
Health & Environmental Research Online (HERO)
Contact Us
Print
Feedback
Export to File
Search:
This record has one attached file:
Add More Files
Attach File(s):
Display Name for File*:
Save
Citation
Tags
HERO ID
7236385
Reference Type
Journal Article
Title
Predictors of Recovery from Traumatic Brain Injury-Induced Prolonged Consciousness Disorder
Author(s)
Abe, H; Shimoji, K; Nagamine, Y; Fujiwara, S; Izumi, SI; ,
Year
2017
Is Peer Reviewed?
1
Journal
Neural Plasticity
ISSN:
2090-5904
EISSN:
1687-5443
Language
English
PMID
28326199
DOI
10.1155/2017/9358092
Abstract
We investigated the clinical predictors of the degree of recovery in patients with prolonged disorders of consciousness (PDC) caused by traumatic brain injury. Fourteen patients with PDC underwent two diffusion tensor imaging (DTI) studies; the first and second scans were performed at 345.6 ± 192.6 and 689.1 ± 272.2 days after the injury, respectively. In addition to the temporal changes in each of these diffusion parameters, fractional anisotropy (FA), mean diffusivity, axial diffusivity (AD), and radial diffusivity were assessed over a 1-year period. Relationship of clinical and DTI parameters with recovery from PDC (RPDC) was evaluated using Spearman's rank-correlation and stepwise multiple linear regression analysis. The mean FA and number of voxels with FA values > 0.4 (VsFA0.4) were significantly decreased at the second scan. A significant positive correlation was observed between the degree of RPDC and mean FA (r = 0.60) and VsFA0.4 (r = 0.68) as well as between the difference in VsFA0.4 (r = 0.63) and AD (r = 0.54) between the first and second scans. On multiple linear regression analysis, initial severity of PDC and the difference in AD remained significantly associated with the degree of RPDC. The microstructural white matter changes observed in this study indicate their potential relation with the degree of RPDC over the longer term.
Home
Learn about HERO
Using HERO
Search HERO
Projects in HERO
Risk Assessment
Transparency & Integrity