Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Main menu
Environmental Topics
Laws & Regulations
About EPA
Health & Environmental Research Online (HERO)
Contact Us
Print
Feedback
Export to File
Search:
This record has one attached file:
Add More Files
Attach File(s):
Display Name for File*:
Save
Citation
Tags
HERO ID
8737539
Reference Type
Meetings & Symposia
Title
Improving well productivity through openhole frac-pack completion design
Author(s)
Kamps, EJ; Chando, JM; Ellis, RC
Year
2010
Publisher
Society of Petroleum Engineers (SPE)
Book Title
Proceedings - SPE Annual Technical Conference and Exhibition
Volume
6
Page Numbers
4935-4948
Language
English
DOI
10.2118/135441-ms
Abstract
Formation damage due to fines migration after the onset of water production presents a major technical challenge for many sandstone reservoirs around the globe. Oftentimes, significant productivity impairment is observed shortly after water breakthrough. This is particularly true for the Chad Doba basin lower "M" and "A" Sand reservoirs where studies have shown that a major contributor to this damage mechanism is the fluid velocity near the wellbore. As a result, exponential decline in productivity index is typically observed over very short periods. To arrest the productivity impairment, various completion techniques were evaluated for ways to reduce the velocity of the produced fluids near the borehole. Typical completion designs employed to date have been cased hole gravel packs (including frac-packs) which enhances the velocity profile of the well as produced fluids converge to the perforations. Maximizing the reservoir to the wellbore interface reduces the velocity profile and conceptually prolongs the onset of formation damage caused by fines migration. Based on that conceptual model, openhole completion techniques were evaluated for feasibility. Upon analyzing the geology of the selected candidate, it became apparent that fracturing the formation was possible as it was a relatively thin amalgamated sand package. As a result, the openhole frac-pack concept became a practical option as it results in the lowest velocity completion possible by maximizing the reservoir surface flow area. Openhole frac-pack completion activities were executed in mid-2009 and well productivity has been sustained even after water breakthrough. This paper reviews initial openhole frac-pack design concepts, execution lessons learned, and well productivity performance. Copyright 2010, Society of Petroleum Engineers.
Home
Learn about HERO
Using HERO
Search HERO
Projects in HERO
Risk Assessment
Transparency & Integrity