Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Main menu
Environmental Topics
Laws & Regulations
About EPA
Health & Environmental Research Online (HERO)
Contact Us
Print
Feedback
Export to File
Search:
This record has one attached file:
Add More Files
Attach File(s):
Display Name for File*:
Save
Citation
Tags
HERO ID
1352172
Reference Type
Journal Article
Title
Large scale smelting of speiss and arsenical copper at Early Bronze Age Arisman, Iran
Author(s)
Rehren, T; Boscher, L; Pernicka, E
Year
2012
Volume
39
Issue
6
Page Numbers
1717-1727
DOI
10.1016/j.jas.2012.01.009
Web of Science Id
WOS:000305041800007
Abstract
We report analyses of different slag types found at the Early Bronze Age site of Arisman in North-West Iran. Here, an estimated 20 tons of slag provide evidence of sustained and large-scale production of metal, using both furnaces and crucibles. The results show that both speiss, an iron-arsenic alloy, and arsenical copper were produced, apparently side-by-side at the same site but using different ores and processes. We offer a tentative outline of the metallurgical processes involved in the production of these arsenic alloys and an explanation why speiss needed to be produced from arsenopyrite in a separate step, instead of using the mineral in its native form as a source for arsenic. We suggest that the speiss was then added either to secondary copper ore or to separately smelted copper metal, in order finally to produce arsenical copper in a regular and well-controlled process.
Keywords
Arsenic; Copper; Smelting; Alloy; Early Bronze Age; Iran; Arisman
Tags
IRIS
•
Arsenic (Inorganic)
1. Literature
Web of Science
Lit search updates through Oct 2015
3. Hazard ID Screening
Excluded/Not relevant
5. Susceptibility Screening
Excluded/Not relevant
•
Arsenic Susceptibility
1. Susceptibility Literature Screening
Keyword Search
2. Excluded
Not Relevant
•
Inorganic Arsenic (7440-38-2) [Final 2025]
1. Initial Lit Search
WOS
WOS
Considered New
2. Lit Search Updates through Oct 2015
WOS
Considered
4. Considered through Oct 2015
7. Other Studies through Oct 2015
Supporting Studies (title screen)
Home
Learn about HERO
Using HERO
Search HERO
Projects in HERO
Risk Assessment
Transparency & Integrity