Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lakeview, Oregon: Volume 1, Text and appendices A through D. Final report: Revision 1
The Lakeview inactive uranium processing site is in Lake County, Oregon, approximately one mile northwest of the town of Lakeview, sixteen miles north of the California-Oregon border, and 96 miles east of Klamath Falls. The total designated site covers an area of 258 acres consisting of a tailings pile (30 acres). seven evaporation ponds (69 acres), the mill buildings, and related structures. The mill buildings and other structures have been decontaminated and are currently being used by Goose Lake Lumber Company. The tailings pile at the processing site was originally stabilized by Atlantic Richfield with an earthen cover 18--24 inches thick. The average depth of the tailings, including the cover, varied from six to eight feet. There were estimated to be 662,000 cubic yards of tailings, windblown contaminated materials, and vicinity property materials. During remedial action under the Uranium Mill Tailings Remedial Action (UMTRA) Project, approximately 264,000 cubic yards of additional contaminated materials were identified from excavations required to remove thorium- and arsenic-contaminated soils. The remedial action for the Lakeview site consisted of the cleanup, relocation, consolidation, and stabilization of all residual radioactive materials and thorium- and arsenic-contaminated materials in a partially below-grade disposal cell at a location approximately seven miles northwest of the tailings site, identified as the Collins Ranch site. A cover, including a radon/infiltration barrier and rock layer for protection from erosion, was Placed on top of the tailings. A rock-soil matrix covers the topslope and provides a growth medium for vegetation. The US Department of Energy (DOE) will retain the license and surveillance and maintenance responsibilities for the final restricted site of 13 acres.